CBXNET rackhousing half rack colocation Berlin 6 months

SH
Rating
300,00 
(357,00  inc tax)
Deployment time3 weeks Werktage Contract period6 months TCO for complete term (net, at 80% power consumption)5129 € Energy costs per kWh00:38 € / kW/h Connection / cooling capacity per rack2 kW
Shipping time and rates:
Vendor rating
Rate vendor
Our advantages
Options
Laufzeitvertrag 6 Monate
300,00 
Monthly
6

19 "rack compartment (half rack)

  • 19 "rack height units: 20
  • Rack with door lock
  • Base area: 600 x 1000
  • Fully air-conditioned data center
  • 1x 1 Gbit / s network connection
  • inclusive / 29 IPv4 network (IPv6 on request)
  • Network availability: 99.9% pa
  • including 5 TB of data traffic
  • BCiX Connect
  • redundant 10 gigabit data center connection
  • Uninterruptible power supply (UPS)
  • emergency generator
  • 24/7 video surveillance
  • Local rate support hotline (Berlin)
  • independent 24/7 access to the rack
  • Housing in Berlin / Germany including 2 personalized keys for data center access

Rack housing in Berlin data centers . You benefit from the competence and the strong service of CBXNET. Operation in a CBXNET data center ensures high availability of your applications at attractive conditions and sustainable operating models (Green IT).

The two Berlin data center areas are also suitable for high geo-redundant availability requirements from financial service providers and customers from the healthcare sector.

Thanks to air-conditioned server rooms , a central uninterruptible power supply ( UPS ) and a non-toxic gas extinguishing system in the event of a fire, your servers are in the best possible location. Close to the heart of Berlin and optimally connected to the Internet.

With gigabit uplinks and a BCiX Connect , you have the best possible connections to the Internet.

The Berlin Commercial Internet Exchange eV BCIX for short connects local and other large providers at a point where they can exchange traffic data directly. This enables a very fast and efficient connection to other networks from Google, Akamai, Vodafone, German Research Network (DFN)

One-time setup costs: € 615.00 net

Additional services

Additional working hours within office hours (Mon-Fri 9 am-7pm): € 95.00 net per hour or part thereof

Additional working hours outside office hours: € 142.50 net per hour or part thereof

Additional data center key for independent 24/7 access to the rack: € 65.00 net per data center key

Deployment time:
3 weeks Werktage
Contract period:
6 months
TCO for complete term (net, at 80% power consumption):
5129
Data center energy costs (including all charges)
Energy costs per kWh:
00:38 € / kW/h
Data center racks
Connection / cooling capacity per rack:
2 kW
Rack type:
1/2 rack (half rack, partition, separate doors)
Rack PDU:
  • Single phase 230V / 16A
Rack depth:
100 cm
Rack width:
60 cm
Rack height (usable U):
20th U
Rack locking system:
Mechanical closure
Rack redundancy power supply:
2N (redundant A + B power supply)
Stromzuführung:
Einphasig 16A
Air conditioning redundancy:
N + 2
PDU A Typ:
Einfache PDU, unmanaged
PDU B Typ:
Einfache PDU, unmanaged
Data center energy efficiency
Operationally measured PUE (12 months):
1.75
Data center sustainability
Electricity from renewable sources:
Source regenerative sources:
Hydropower in the aplen area
Regenerative Energie wird als Zertifikat eingekauft:
Betreiber erzeugt selbst regenerative Energie:
Anteil selbst erzeugter Energie am Gesamtverbrauch:
100 %
Nutzung Abwärme des RZ:
Errichtung des RZ mit nachhaltigen Materialien:
Nachhaltige Materialien zertifiziert:
Used refrigerant:
R407C
Data center SLA
Power availability basis:
Annual mean
Power availability for redundantly connected customers:
99.99 %
Power availability basis:
Annual mean
Guaranteed availability of air conditioning:
99.75 %
Availability of air conditioning base:
Annual mean
Guaranteed supply air temperature minimum:
20th °C
Guaranteed supply air temperature maximum:
28 °C
Guaranteed availability network connection / IP transit:
99.95 %
Availability network connection basis:
Annual mean
General data center
Type of building:
Data center in mixed-use buildings
Construction:
Solid construction (concrete / stone)
storage areas:
parking :
Covered delivery:
Truck loading ramp / lifting table:
Temporary jobs:
Permanent jobs for rent:
Use of meeting rooms possible:
Temporary storage space:
Permanently rentable storage space:
Raised floors in the data center areas:
Soil is dissipative:
Floor area load:
5 kN per m2
Point load floor:
2 kN
Clear room height of IT rooms:
290 cm
Clear height transport routes (minimum) :
200 cm
Data center in airport approach lane:
No
Data center near train tracks:
No
Data center near the motorway:
No, at least 500m away
Data center in floodplain:
No
Data center in earthquake zone:
No
Data center in the vicinity of potentially explosive facilities:
No
Data center close to other hazards:
No
Data center security
Protection / zone concept was implemented:
Burglary protection building outer shell:
No classification
Burglary protection IT rooms:
RC 1
Burglary protection technical operating rooms:
RC 1
Burglary protection security center:
No classification
Fenced off area:
Fence with step over protection:
Fence and gate monitored by sensors:
Fence and gate under video surveillance:
Apron surveillance with video:
Apron monitoring with additional sensors:
Approach protection building:
Burglar alarm system building outer shell:
Burglar alarm system IT areas:
Burglar alarm system technical operating rooms:
Intrusion alarm system for traffic areas:
Video surveillance building outer shell:
Video surveillance IT areas:
Video surveillance of technical operating rooms:
Video surveillance traffic areas:
Separation system / lock building access:
Isolation system / sluice IT rooms:
Separation system / lock technical operating rooms:
Electronic access control system:
Two-factor verification (card + pin, etc):
Biometric verification:
Security Staff:
No security service on site
Security Service on call:
Data center fire protection
Walls of IT rooms:
F90
Doors IT rooms:
T30 RS
Walls of technical operating rooms:
F90
Doors for technical operating rooms:
T30 RS
Wall openings sealed in wall class:
Floor coverings flame-retardant / non-combustible:
Fire alarm system with smoke detectors:
Fire alarm system with combination detectors (smoke, heat):
IT rooms with RAS system (early fire detection):
Technical operating rooms with RAS system (early fire detection):
IT rooms with extinguishing systems or oxygen reduction:
Technical operating rooms with extinguishing system or oxygen reduction:
Switching off the fresh air system in the event of a fire outside the building:
Halogen-free flooring:
Halogen-free cable:
Data center supply infrastructure
Voltage level mains supply:
Medium voltage
Redundancy power grid:
Supply from a substation
Medium voltage supply redundancy:
  • Redundant stitch feed
Medium voltage main distribution redundancy:
N (no redundancy)
Transformer redundancy:
N + 1
Backup redundancy system:
N (no redundancy)
Redundancy of storage tanks:
N
Separate tank for each emergency power system:
Network replacement system fuel supply:
12 to 24 hours of operation
UPS system redundancy:
N + 1
Batteries:
Single strand
Low voltage distributions redundancy:
N (no redundancy)
Sub-distributions / busbars in IT rooms redundancy:
2N
Power rails in IT rooms:
Cable routing from transformer to IT rooms:
Single, no redundancy
Type of air conditioning:
Direct Expansion, ULK / In-Row
Air conditioning redundancy devices:
N + 2
Lightning protection:
Protection class IV
Data center network and connectivity
Network building supply:
Redundant routing, separated structurally and in terms of fire protection
Network cable routing in the building:
Redundant routing, separated structurally and in terms of fire protection
Network distributor / meet-me rooms:
Single, no redundancy
Active network components:
2N
Total IP transit capacity:
30th Gbit/s
Upstream carriers used:
Telia, euNetworks, BCIX
Exchange points that you have connected yourself:
BCIX
Available carriers for Layer 1,2,3 Connectivity:
Telia, Versatel, euNetworks, Telekom, COLT, BCIX, Syseleven
Data center latency times from data center to:
Bratislava:
26th ms
Iceland:
55 ms
Luxembourg:
18th ms
Milan:
19th ms
Moscow:
39 ms
Prague:
21st ms
Stockholm:
29 ms
Vienna:
18th ms
Zurich:
17th ms
Data center hyperscaler connectivity
Amazon AWS:
Bandwidth:
10
Google Cloud Plattform:
Bandwidth:
10
Microsoft Azure:
IBM Bluemix / Softlayer:
VMWare VCloud Air:
Oracle:
Alibaba:
Others:
Akamai
Data center certifications
ISO 9001:
ISO 27001:
ISO 50001:
Data center services
Remote hands (reset, opt. Test, etc.):
  • 24x7
Extended remote hands (reboot, patch, etc.):
24x7
Hardware support (HDD, power supply, etc.):
No hardware support
Atdn. service for service providers:
During business hours
Web tool for tickets and orders:
Acceptance of customer shipments:
Unpacking / packing service, dispatch of goods:
Rack installation of customer equipment:
24x7
Documentation / labeling of devices and cabling:
Web-based documentation system for customers:
Network equipment support:
During business hours
Creation of a service report:
Per month
Other services offered:
Veeam Cloud Connect
Other services offered:
ComBox.syno backup
Other services offered:
Shared firewall
Data center access and staff
Access to the data center:
  • 24h / 7 days

Flyer (2019_CBXNET-Flyer.pdf, 1,221 Kb) [Download]

Factsheet halbes Rack (Factsheet_Compartment_halbes_Rack_CBXNET.pdf, 28 Kb) [Download]

No posts found

0
%
Criteria Average rating Count of ratings
How reliable is the vendor?
How is the communicatin with the vendor?
How transparent is the vendor?
How fair is the vendor?
  • Popular
  • Recently viewed
  • New