Your rack is in a WindCORES in Paderborn, a "state-of-the-art" data center from WestfalenWIND IT, with all the features you would expect from a modern data center. We are proud of our USP's: Green electricity and CO2 neutral! Power consumption up to 30 KW per rack possible! The POE is at our expense! We show the "Total cost of ownership" (TCO); with us there are no hidden costs! WindCORES is regionally available, scalable and geo-redundant on request with direct glass fiber to DE-CIX Frankfurt EN 50600 and VK 3 certified For early bookers: Including a guided tour of the wind turbine!
Location:

Energy costs per kWh0.1949 € / kW/h Connection / cooling capacity per rack1 kW
1119,00 € 1019,00  (1212,61  inc tax) You save net: 100,00 €
In stock
DC10 - Easter renting Server room / rack Construction phase 1: up to 1,000 m² of rental space, 500 m² of which are equipped with 160 racks and PDUs, and 500 m² can be configured on customer request. Construction phase 2: Another 4,500 m² server room capacity can be planned...
Location:

Deployment time2 weeks Werktage Energy costs per kWh00:16 € / kW/h Energy costs included in the price as a flat rateNo
Contact us for a price
In stock
Green Green IT GreenIT Eco Windkraft
Your rack unit is in a WindCORES in Paderborn, a "state-of-the-art" data center from WestfalenWIND IT, with all the features you would expect from a modern data center. We are proud of our USP's: Green electricity and CO2 neutral! Power consumption up to 30 KW per rack possible! The POE is at our expense! We show the "Total cost of ownership" (TCO); with us there are no hidden costs! WindCORES is regionally available, scalable and geo-redundant on request with direct glass fiber to DE-CIX Frankfurt EN 50600 and VK 3 certified For early bookers: Including a guided tour of the wind turbine!
Location:

Iggenhauser Weg, 33165 Lichtenau, Deutschland

249,00  (296,31  inc tax)
In stock
we are the centron
Location:

Heganger, 96103 Hallstadt, Deutschland

Deployment time2 weeks Werktage Contract period12 months TCO for complete term (net, at 80% power consumption)14422 € Energy costs per kWh00:25 € / kW/h Energy costs included in the price as a flat rateNo
699,00 € 418,60  (498,13  inc tax) You save net: 280,40 €
In stock
we are the centron
Location:

Heganger, 96103 Hallstadt, Deutschland

Deployment time2 weeks Werktage Contract period12 months TCO for complete term (net, at 80% power consumption)18142 € Energy costs per kWh00:25 € / kW/h Energy costs included in the price as a flat rateNo
999,00 € 838,60  (997,93  inc tax) You save net: 160,40 €
In stock
Your rack is in a WindCORES in Paderborn, a "state-of-the-art" data center from WestfalenWIND IT, with all the features you would expect from a modern data center. We are proud of our USP's: Green electricity and CO2 neutral! Power consumption up to 30 KW per rack possible! The POE is at our expense! We show the "Total cost of ownership" (TCO); with us there are no hidden costs! WindCORES is regionally available, scalable and geo-redundant on request with direct glass fiber to DE-CIX Frankfurt EN 50600 and VK 3 certified For early bookers: Including a guided tour of the wind turbine!
Location:

Iggenhauser Weg, 33165 Lichtenau, Deutschland

Energy costs per kWh0.1949 € / kW/h Connection / cooling capacity per rack1 kW
1119,00  (1331,61  inc tax)
In stock
DC10 - Easter renting Server room / Rack Construction phase 1: up to 1,000 m² of rental space, 500 m² of which are equipped with 160 racks and PDUs, and 500 m² can be configured on customer request. Construction phase 2: another 4,500 m² server room capacity can be planned...
Location:

Ostermiething, 5121 Ostermiething, Österreich

Deployment time2 weeks Werktage Energy costs per kWh00:16 € / kW/h Energy costs included in the price as a flat rateNo
Contact us for a price
In stock
NewTelco 's strategically located data centers offer highly flexible equipment housing (from unit to dedicated cage), providing our customers with direct access to the largest European telecommunication hub and 450+ network operators, ISPs, content providers and other telcos. NewTelco has its own advanced data centers in Frankfurt am Main (Germany), Kiev (Ukraine) and Tbilisi (Georgia). The services are available at the most important telecom locations around the globe, including Amsterdam, Hong Kong, London, Stockholm, Vienna, etc.
Location:

Kleyerstraße 88, 60326 Frankfurt am Main, Deutschland

Deployment time1 to 3 working days Werktage Contract period12 months TCO for complete term (net, at 80% power consumption)19328 € Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo
1200,00  (1428,00  inc tax)
In stock
NewTelco 's strategically located data centers offer highly flexible equipment housing (from unit to dedicated cage), providing our customers with direct access to the largest European telecommunication hub and 450+ network operators, ISPs, content providers and other telcos. NewTelco has its own advanced data centers in Frankfurt am Main (Germany), Kiev (Ukraine) and Tbilisi (Georgia). The services are available at the most important telecom locations around the globe, including Amsterdam, Hong Kong, London, Stockholm, Vienna, etc.
Location:

Kleyerstraße, 60326 Frankfurt am Main, Deutschland

Deployment time1 to 3 working days Werktage Contract period12 months TCO for complete term (net, at 80% power consumption)9343 € Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo
600,00  (714,00  inc tax)
In stock
NewTelco 's strategically located data centers offer highly flexible equipment housing (from unit to dedicated cage), providing our customers with direct access to the largest European telecommunication hub and 450+ network operators, ISPs, content providers and other telcos. NewTelco has its own advanced data centers in Frankfurt am Main (Germany), Kiev (Ukraine) and Tbilisi (Georgia). The services are available at the most important telecom locations around the globe, including Amsterdam, Hong Kong, London, Stockholm, Vienna, etc.
Location:

Kleyerstraße 88, 60326 Frankfurt am Main, Deutschland

Deployment time1 to 3 working days Werktage Contract period12 months TCO for complete term (net, at 80% power consumption)19328 € Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo
1200,00  (1428,00  inc tax)
In stock
NewTelco 's strategically located data centers offer highly flexible equipment housing (from unit to dedicated cage), providing our customers with direct access to the largest European telecommunication hub and 450+ network operators, ISPs, content providers and other telcos. NewTelco has its own advanced data centers in Frankfurt am Main (Germany), Kiev (Ukraine) and Tbilisi (Georgia). The services are available at the most important telecom locations around the globe, including Amsterdam, Hong Kong, London, Stockholm, Vienna, etc.
Location:

Eschborner Landstraße, 60489 Frankfurt am Main, Deutschland

Deployment time1 to 3 working days Werktage Contract period12 months TCO for complete term (net, at 80% power consumption)19328 € Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo
1200,00  (1428,00  inc tax)
In stock
NewTelco 's strategically located data centers offer highly flexible equipment housing (from unit to dedicated cage), providing our customers with direct access to the largest European telecommunication hub and 450+ network operators, ISPs, content providers and other telcos. NewTelco has its own advanced data centers in Frankfurt am Main (Germany), Kiev (Ukraine) and Tbilisi (Georgia). The services are available at the most important telecom locations around the globe, including Amsterdam, Hong Kong, London, Stockholm, Vienna, etc.
Location:

Eschborner Landstraße, 60489 Frankfurt am Main, Deutschland

Deployment time1 to 3 working days Werktage Contract period12 months TCO for complete term (net, at 80% power consumption)19328 € Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo
1200,00  (1428,00  inc tax)
In stock
NewTelco 's strategically located data centers offer highly flexible equipment housing (from unit to dedicated cage), providing our customers with direct access to the largest European telecommunication hub and 450+ network operators, ISPs, content providers and other telcos. NewTelco has its own advanced data centers in Frankfurt am Main (Germany), Kiev (Ukraine) and Tbilisi (Georgia). The services are available at the most important telecom locations around the globe, including Amsterdam, Hong Kong, London, Stockholm, Vienna, etc.
Location:

Eschborner Landstraße, 60489 Frankfurt am Main, Deutschland

Deployment time1 to 3 working days Werktage Contract period12 months TCO for complete term (net, at 80% power consumption)9343 € Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo
600,00  (714,00  inc tax)
In stock
COLO PRICE AND CONDITIONS   •  25 RU, rack dimensions 600 * 1000 * 50U in AM3 , Equinix •  2 kVA power (we will be able most probably to offer you even more power) •  NRC € 2600 •  MRC 1290 € including 2 kVA power consumption •  Smart hands € 150 per hour (business day)
Location:

Deployment time1 to 3 working days Werktage
1290,00  (1535,10  inc tax)
In stock
TeleData SPACE Co-Locate Are you looking for an access and fail-safe environment for your IT systems? Then let TeleData advise you. We have state-of-the-art data centers that meet the latest security standards. With TeleData SPACE Co-Locate, TeleData offers you the optimal space for your...
Location:

Ziegelei 3, 88090 Immenstaad am Bodensee, Deutschland

Deployment time4 to 6 weeks Werktage Contract period6 months TCO for complete term (net, at 80% power consumption)6650 € Energy costs per kWh00:28 € / kW/h Energy costs included in the price as a flat rateNo
650,00  (773,50  inc tax)
In stock
SH
Rack housing in Berlin data centers . You benefit from the competence and the strong service of CBXNET. Operation in a CBXNET data center ensures high availability of your applications at attractive conditions and sustainable operating models (Green IT). 19 "rack compartment (quarter...
Location:

Lorenzstraße 5, 12209 Berlin, Deutschland

Deployment time3 weeks Werktage Contract period6 months TCO for complete term (net, at 80% power consumption)3292 € Energy costs per kWh00:38 € / kW/h Connection / cooling capacity per rack1 kW
220,00  (261,80  inc tax)
In stock
TeleData SPACE Co-Locate Are you looking for an access and fail-safe environment for your IT systems? Then let TeleData advise you. We have state-of-the-art data centers that meet the latest security standards. With TeleData SPACE Co-Locate, TeleData offers you the optimal space for your...
Location:

Deployment time4 to 6 weeks Werktage Contract period24 months TCO for complete term (net, at 80% power consumption)25849 € Energy costs per kWh00:28 € / kW/h Energy costs included in the price as a flat rateNo
650,00  (773,50  inc tax)
In stock
TeleData SPACE Co-Locate Are you looking for an access and fail-safe environment for your IT systems? Then let TeleData advise you. We have state-of-the-art data centers that meet the latest security standards. With TeleData SPACE Co-Locate, TeleData offers you the optimal space for your...
Location:

Ziegelei 3, 88090 Immenstaad am Bodensee, Deutschland

Deployment time4 to 6 weeks Werktage Contract period60 months TCO for complete term (net, at 80% power consumption)64248 € Energy costs per kWh00:28 € / kW/h Energy costs included in the price as a flat rateNo
650,00  (773,50  inc tax)
In stock
TeleData SPACE Co-Locate Are you looking for an access and fail-safe environment for your IT systems? Then let TeleData advise you. We have state-of-the-art data centers that meet the latest security standards. With TeleData SPACE Co-Locate, TeleData offers you the optimal space for your...
Location:

Ziegelei 3, 88090 Immenstaad am Bodensee, Deutschland

Deployment time4 to 6 weeks Werktage Contract period12 months TCO for complete term (net, at 80% power consumption)13050 € Energy costs per kWh00:28 € / kW/h Energy costs included in the price as a flat rateNo
650,00  (773,50  inc tax)
In stock
TeleData SPACE Co-Locate Are you looking for an access and fail-safe environment for your IT systems? Then let TeleData advise you. We have state-of-the-art data centers that meet the latest security standards. With TeleData SPACE Co-Locate, TeleData offers you the optimal space for your...
Location:

Ziegelei 3, 88090 Immenstaad am Bodensee, Deutschland

Deployment time4 to 6 weeks Werktage Contract period36 months TCO for complete term (net, at 80% power consumption)38649 € Energy costs per kWh00:28 € / kW/h Energy costs included in the price as a flat rateNo
650,00  (773,50  inc tax)
In stock
Wavelength and VLAN to Frankfurt and Düsseldorf on request. Trusted-Colo GmbH & Co. KG has been operating its own data center since 2020 in Alsbach-Hähnlein in southern Hesse. The location is easily accessible via the A5, A67 and B3. The data center is designed as TIER III +....
Location:

Deployment time1 to 3 working days Werktage Contract period36 months TCO for complete term (net, at 80% power consumption)30470 € Energy costs per kWh00:25 € / kW/h Energy costs included in the price as a flat rateNo
400,00  (476,00  inc tax)
In stock
Wavelength and VLAN to Frankfurt and Düsseldorf on request. Trusted-Colo GmbH & Co. KG has been operating its own data center since 2020 in Alsbach-Hähnlein in southern Hesse. The location is easily accessible via the A5, A67 and B3. The data center is designed as TIER III +....
Location:

Sandwiesenstraße 34, 64665 Alsbach-Hähnlein, Deutschland

Deployment time1 to 3 working days Werktage Contract period6 months TCO for complete term (net, at 80% power consumption)5648 € Energy costs per kWh00:25 € / kW/h Energy costs included in the price as a flat rateNo
495,00  (589,05  inc tax)
In stock
SH
19 "rack compartment (half rack) 19 "rack height units: 20 Rack with door lock Base area: 600 x 1000 Fully air-conditioned data center 1x 1 Gbit / s network connection inclusive / 29 IPv4 network (IPv6 on request) Network availability: 99.9% pa including 5 TB of...
Location:

Lorenzstraße 5, 12209 Berlin, Deutschland

Deployment time3 weeks Werktage Contract period6 months TCO for complete term (net, at 80% power consumption)8493 € Energy costs per kWh00:38 € / kW/h Connection / cooling capacity per rack2 kW
225,00  (267,75  inc tax)
In stock
One-time setup costs: € 799.00 Whether for business or pleasure - if the digital infrastructure fails, you will feel the consequences directly. You need a strong partner to keep your data safe and to have access to it at all times. The KÜS-DATA data center is one of the most secure in Germany...
Location:

Prof.-Pirlet-Straße, 66679 Losheim am See, Deutschland

Deployment time1 week Werktage Contract period36 months TCO for complete term (net, at 80% power consumption)36762 € Energy costs per kWh00:28 € / kW/h Energy costs included in the price as a flat rateNo
499,00  (593,81  inc tax)
In stock
One-time setup costs: € 799.00 Whether for business or pleasure - if the digital infrastructure fails, you will feel the consequences directly. You need a strong partner to keep your data safe and to have access to it at all times. The KÜS-DATA data center is one of the most secure in Germany...
Location:

Prof.-Pirlet-Straße, 66679 Losheim am See, Deutschland

Deployment time1 week Werktage Contract period60 months TCO for complete term (net, at 80% power consumption)90735 € Energy costs per kWh00:28 € / kW/h Energy costs included in the price as a flat rateNo
One-time setup costs: € 799.00 Whether for business or pleasure - if the digital infrastructure fails, you will feel the consequences directly. You need a strong partner to keep your data safe and to have access to it at all times. The KÜS-DATA data center is one of the most secure in Germany...
Location:

Prof.-Pirlet-Straße, 66679 Losheim am See, Deutschland

Deployment time1 week Werktage Contract period6 months TCO for complete term (net, at 80% power consumption)13992 € Energy costs per kWh00:28 € / kW/h Energy costs included in the price as a flat rateNo
699,00  (831,81  inc tax)
In stock
One-time setup costs: € 799.00 Whether for business or pleasure - if the digital infrastructure fails, you will feel the consequences directly. You need a strong partner to keep your data safe and to have access to it at all times. The KÜS-DATA data center is one of the most secure in Germany...
Location:

Prof.-Pirlet-Straße, 66679 Losheim am See, Deutschland

Deployment time1 week Werktage Contract period60 months TCO for complete term (net, at 80% power consumption)57737 € Energy costs per kWh00:28 € / kW/h Energy costs included in the price as a flat rateNo
One-time setup costs: € 799.00 Whether for business or pleasure - if the digital infrastructure fails, you will feel the consequences directly. You need a strong partner to keep your data safe and to have access to it at all times. The KÜS-DATA data center is one of the most secure in Germany...
Location:

Prof.-Pirlet-Straße, 66679 Losheim am See, Deutschland

Deployment time1 week Werktage Contract period60 months TCO for complete term (net, at 80% power consumption)123733 € Energy costs per kWh00:28 € / kW/h Energy costs included in the price as a flat rateNo
One-time setup costs: € 799.00 Whether for business or pleasure - if the digital infrastructure fails, you will feel the consequences directly. You need a strong partner to keep your data safe and to have access to it at all times. The KÜS-DATA data center is one of the most secure in Germany...
Location:

Prof.-Pirlet-Straße, 66679 Losheim am See, Deutschland

Deployment time1 week Werktage Contract period6 months TCO for complete term (net, at 80% power consumption)10693 € Energy costs per kWh00:28 € / kW/h Energy costs included in the price as a flat rateNo
649,00  (772,31  inc tax)
In stock
One-time setup costs: € 799.00 Whether for business or pleasure - if the digital infrastructure fails, you will feel the consequences directly. You need a strong partner to keep your data safe and to have access to it at all times. The KÜS-DATA data center is one of the most secure in Germany...
Location:

Prof.-Pirlet-Straße, 66679 Losheim am See, Deutschland

Deployment time1 week Werktage Contract period12 months TCO for complete term (net, at 80% power consumption)20586 € Energy costs per kWh00:28 € / kW/h Energy costs included in the price as a flat rateNo
One-time setup costs: € 799.00 Whether for business or pleasure - if the digital infrastructure fails, you will feel the consequences directly. You need a strong partner to keep your data safe and to have access to it at all times. The KÜS-DATA data center is one of the most secure in Germany...
Location:

Prof.-Pirlet-Straße, 66679 Losheim am See, Deutschland

Deployment time1 week Werktage Contract period36 months TCO for complete term (net, at 80% power consumption)56561 € Energy costs per kWh00:28 € / kW/h Energy costs included in the price as a flat rateNo
549,00  (653,31  inc tax)
In stock
One-time setup costs: € 799.00 Whether for business or pleasure - if the digital infrastructure fails, you will feel the consequences directly. You need a strong partner to keep your data safe and to have access to it at all times. The KÜS-DATA data center is one of the most secure in Germany...
Location:

Prof.-Pirlet-Straße, 66679 Losheim am See, Deutschland

Deployment time1 week Werktage Contract period24 months TCO for complete term (net, at 80% power consumption)39173 € Energy costs per kWh00:28 € / kW/h Energy costs included in the price as a flat rateNo
One-time setup costs: € 799.00 Whether for business or pleasure - if the digital infrastructure fails, you will feel the consequences directly. You need a strong partner to keep your data safe and to have access to it at all times. The KÜS-DATA data center is one of the most secure in Germany...
Location:

Prof.-Pirlet-Straße, 66679 Losheim am See, Deutschland

Deployment time1 week Werktage Contract period36 months TCO for complete term (net, at 80% power consumption)76360 € Energy costs per kWh00:28 € / kW/h Energy costs included in the price as a flat rateNo
599,00  (712,81  inc tax)
In stock
One-time setup costs: € 799.00 Whether for business or pleasure - if the digital infrastructure fails, you will feel the consequences directly. You need a strong partner to keep your data safe and to have access to it at all times. The KÜS-DATA data center is one of the most secure in Germany...
Location:

Prof.-Pirlet-Straße, 66679 Losheim am See, Deutschland

Deployment time1 week Werktage Contract period12 months TCO for complete term (net, at 80% power consumption)27186 € Energy costs per kWh00:28 € / kW/h Energy costs included in the price as a flat rateNo
One-time setup costs: € 799.00 Whether for business or pleasure - if the digital infrastructure fails, you will feel the consequences directly. You need a strong partner to keep your data safe and to have access to it at all times. The KÜS-DATA data center is one of the most secure in Germany...
Location:

Prof.-Pirlet-Straße, 66679 Losheim am See, Deutschland

Deployment time1 week Werktage Contract period24 months TCO for complete term (net, at 80% power consumption)25974 € Energy costs per kWh00:28 € / kW/h Energy costs included in the price as a flat rateNo
One-time setup costs: € 799.00 Whether for business or pleasure - if the digital infrastructure fails, you will feel the consequences directly. You need a strong partner to keep your data safe and to have access to it at all times. The KÜS-DATA data center is one of the most secure in Germany...
Location:

Prof.-Pirlet-Straße, 66679 Losheim am See, Deutschland

Deployment time1 week Werktage Contract period24 months TCO for complete term (net, at 80% power consumption)52373 € Energy costs per kWh00:28 € / kW/h Energy costs included in the price as a flat rateNo
649,00  (772,31  inc tax)
In stock
SH
19 "rack compartment (quarter rack) 19 "rack height units: 8 Rack with door lock Base area: 600 x 800 Fully air-conditioned data center 1x 1 Gbit / s network connection inclusive / 29 IPv4 network (IPv6 on request) Network availability: 99.9% pa including 5 TB...
Location:

Lorenzstraße 5, 12209 Berlin, Deutschland

Deployment time3 weeks Werktage Contract period6 months TCO for complete term (net, at 80% power consumption)4819 € Energy costs per kWh00:38 € / kW/h Connection / cooling capacity per rack1 kW
145,00  (172,55  inc tax)
In stock
One-time setup costs: € 799.00 Whether for business or pleasure - if the digital infrastructure fails, you will feel the consequences directly. You need a strong partner to keep your data safe and to have access to it at all times. The KÜS-DATA data center is one of the most secure in Germany...
Location:

Prof.-Pirlet-Straße, 66679 Losheim am See, Deutschland

Deployment time1 week Werktage Contract period6 months TCO for complete term (net, at 80% power consumption)7393 € Energy costs per kWh00:28 € / kW/h Energy costs included in the price as a flat rateNo
599,00  (712,81  inc tax)
In stock
One-time setup costs: € 799.00 Whether for business or pleasure - if the digital infrastructure fails, you will feel the consequences directly. You need a strong partner to keep your data safe and to have access to it at all times. The KÜS-DATA data center is one of the most secure in Germany...
Location:

Prof.-Pirlet-Straße, 66679 Losheim am See, Deutschland

Deployment time1 week Werktage Contract period12 months TCO for complete term (net, at 80% power consumption)13987 € Energy costs per kWh00:28 € / kW/h Energy costs included in the price as a flat rateNo
SH
Rack housing in a Berlin colocation data center . You benefit from the competence and the strong service of CBXNET. Operation in a CBXNET data center ensures high availability of your applications at attractive conditions and sustainable operating models (Green IT). 19 "Rack (1/1) -...
Location:

Lorenzweg 5, 12099 Berlin, Deutschland

Deployment time3 weeks Werktage Contract period6 months TCO for complete term (net, at 80% power consumption)7626 € Energy costs per kWh00:38 € / kW/h Connection / cooling capacity per rack3 kW
490,00  (583,10  inc tax)
In stock
One-time setup costs: € 1600.00 net Colocation rack offer: High-quality 19 "server and network cabinet with 47 height units (HU), secured by a lock. Available in the dimensions 600/800 x 1,200 (W x D mm). Electrical power consumption from 3 kW to 8 kW per colocation rack can be...
Location:

Landshuter Str. 7, 85716 Unterschleißheim, Deutschland

Deployment timedepends on availability Werktage Contract period12 months TCO for complete term (net, at 80% power consumption)15400 € Energy costs included in the price as a flat rateYes Connection / cooling capacity per rack3 kW
1150,00  (1368,50  inc tax)
In stock
SH
19 "rack compartment (half rack) 19 "rack height units: 20 Rack with door lock Base area: 600 x 1000 Fully air-conditioned data center 1x 1 Gbit / s network connection inclusive / 29 IPv4 network (IPv6 on request) Network availability: 99.9% pa including 5 TB of...
Location:

Lorenzweg 5, 12099 Berlin, Deutschland

Deployment time3 weeks Werktage Contract period6 months TCO for complete term (net, at 80% power consumption)5129 € Energy costs per kWh00:38 € / kW/h Connection / cooling capacity per rack2 kW
300,00  (357,00  inc tax)
In stock
One-time setup costs: € 1200.00 net Colocation rack offer: High-quality 19 "server and network cabinet with 47 height units (HU), secured by a lock. Available in the dimensions 600/800 x 1,200 (W x D mm). Electrical power consumption from 3 kW to 8 kW per colocation rack can be...
Location:

Landshuter Str. 7, 85716 Unterschleißheim, Deutschland

Deployment timedepends on availability Werktage Contract period36 months TCO for complete term (net, at 80% power consumption)15400 € Energy costs included in the price as a flat rateYes Connection / cooling capacity per rack5 kW
One-time setup costs: € 1200.00 net Colocation rack offer: High-quality 19 "server and network cabinet with 47 height units (HU), secured by a lock. Available in the dimensions 600/800 x 1,200 (W x D mm). Electrical power consumption from 3 kW to 8 kW per colocation rack can be...
Location:

Landshuter Str. 7, 85716 Unterschleißheim, Deutschland

Deployment timedepends on availability Werktage Contract period60 months TCO for complete term (net, at 80% power consumption)15400 € Energy costs included in the price as a flat rateYes Connection / cooling capacity per rack4 kW
One-time setup costs: € 1600.00 net Colocation rack offer: High-quality 19 "server and network cabinet with 47 height units (HU), secured by a lock. Available in the dimensions 600/800 x 1,200 (W x D mm). Electrical power consumption from 3 kW to 8 kW per colocation rack can be...
Location:

Landshuter Str. 7, 85716 Unterschleißheim, Deutschland

Deployment timedepends on availability Werktage Contract period24 months TCO for complete term (net, at 80% power consumption)15400 € Energy costs included in the price as a flat rateYes Connection / cooling capacity per rack5 kW
One-time setup costs: € 1600.00 net Colocation rack offer: High-quality 19 "server and network cabinet with 47 height units (HU), secured by a lock. Available in the dimensions 600/800 x 1,200 (W x D mm). Electrical power consumption from 3 kW to 8 kW per colocation rack can be...
Location:

Landshuter Str. 7, 85716 Unterschleißheim, Deutschland

Deployment timedepends on availability Werktage Contract period12 months TCO for complete term (net, at 80% power consumption)15400 € Energy costs included in the price as a flat rateYes Connection / cooling capacity per rack5 kW
One-time setup costs: € 1600.00 net Colocation rack offer: High-quality 19 "server and network cabinet with 47 height units (HU), secured by a lock. Available in the dimensions 600/800 x 1,200 (W x D mm). Electrical power consumption from 3 kW to 8 kW per colocation rack can be...
Location:

Landshuter Allee 7, 80637 München, Deutschland

Deployment timedepends on availability Werktage Contract period24 months TCO for complete term (net, at 80% power consumption)15400 € Energy costs included in the price as a flat rateYes Connection / cooling capacity per rack3 kW
1150,00  (1368,50  inc tax)
In stock
One-time setup costs: € 1200.00 net Colocation rack offer: High-quality 19 "server and network cabinet with 47 height units (HU), secured by a lock. Available in the dimensions 600/800 x 1,200 (W x D mm). Electrical power consumption from 3 kW to 8 kW per colocation rack can be...
Location:

Landshuter Str. 7, 85716 Unterschleißheim, Deutschland

Deployment timedepends on availability Werktage Contract period36 months TCO for complete term (net, at 80% power consumption)15400 € Energy costs included in the price as a flat rateYes Connection / cooling capacity per rack3 kW
Server room / rack Two server rooms in separate fire zones. Available in the data center up to 300 m² of rental space. Redundant power supply per rack. Power consumption between 4 kW and 20 kW per rack. Real-time measurement of electricity consumption. Redundant, needs-based...
Location:

Am Autobahnkreuz, Ellhofen, Deutschland

Energy costs per kWh00:22 € / kW/h Connection / cooling capacity per rack4 kW
Contact us for a price
In stock
One-time setup costs: € 1600.00 net Colocation rack offer: High-quality 19 "server and network cabinet with 47 height units (HU), secured by a lock. Available in the dimensions 600/800 x 1,200 (W x D mm). Electrical power consumption from 3 kW to 8 kW per colocation rack can be...
Location:

Landshuter Str. 7, 85716 Unterschleißheim, Deutschland

Deployment timedepends on availability Werktage Contract period24 months TCO for complete term (net, at 80% power consumption)15400 € Energy costs included in the price as a flat rateYes Connection / cooling capacity per rack4 kW