NTT Global Data Centers EMEA GmbH

NTT Global Data Centers EMEA GmbH

Description


About the Global Data Centers division of NTT Ltd.


Global Data Centers is a division of NTT Ltd. and incorporates DPA, e-shelter, Gyron, Netmagic, NTT Indonesia Nexcenter, RagingWire and other NTT Communications group data center divisions. Our combined global platform is one of the largest in the world, with over 160 data centers spanning more than 20 countries and regions including North America, Europe, Africa and APAC.
As a neutral operator, we offer access to multiple cloud providers, a large variety of Internet Exchanges and telecommunication network providers including our own IPv6 compliant, tier 1 global IP network. Our clients benefit from tailored infrastructure and experience consistent best practices in design and operations across all of our highly reliable, scalable, and customizable data centers. Visit us at our new website datacenter.hello.global.ntt.


About NTT Ltd.


NTT Ltd. is a leading global technology services company. Working with organizations around the world, we achieve business outcomes through intelligent technology solutions. For us, intelligent means data driven, connected, digital and secure. Our global assets and integrated ICT stack capabilities provide unique offerings in cloud-enabling networking, hybrid cloud, data centers, digital transformation, client experience, workplace and cybersecurity.
As a global ICT provider, we employ more than 40,000 people in a diverse and dynamic workplace that spans 57 countries, trading in 73 countries and delivering services in over 200 countries and regions. Together we enable the connected future. Visit us at hello.global.ntt.

Vendor products Products found: 11

One-time setup costs: € 1200.00 net Colocation rack offer: High-quality 19 "server and network cabinet with 47 height units (HU), secured by a lock. Available in the dimensions 600/800 x 1,200 (W x D mm). Electrical power consumption from 3 kW to 8 kW per colocation rack can be...
Location:

Deployment timedepends on availability Werktage Contract period36 months TCO for complete term (net, at 80% power consumption)15400 € Energy costs included in the price as a flat rateYes Connection / cooling capacity per rack5 kW
One-time setup costs: € 1600.00 net Colocation rack offer: High-quality 19 "server and network cabinet with 47 height units (HU), secured by a lock. Available in the dimensions 600/800 x 1,200 (W x D mm). Electrical power consumption from 3 kW to 8 kW per colocation rack can be...
Location:

Deployment timedepends on availability Werktage Contract period24 months TCO for complete term (net, at 80% power consumption)15400 € Energy costs included in the price as a flat rateYes Connection / cooling capacity per rack5 kW
One-time setup costs: € 1600.00 net Colocation rack offer: High-quality 19 "server and network cabinet with 47 height units (HU), secured by a lock. Available in the dimensions 600/800 x 1,200 (W x D mm). Electrical power consumption from 3 kW to 8 kW per colocation rack can be...
Location:

Deployment timedepends on availability Werktage Contract period12 months TCO for complete term (net, at 80% power consumption)15400 € Energy costs included in the price as a flat rateYes Connection / cooling capacity per rack3 kW
1150,00  (1368,50  inc tax)
In stock
One-time setup costs: € 1600.00 net Colocation rack offer: High-quality 19 "server and network cabinet with 47 height units (HU), secured by a lock. Available in the dimensions 600/800 x 1,200 (W x D mm). Electrical power consumption from 3 kW to 8 kW per colocation rack can be...
Location:

Deployment timedepends on availability Werktage Contract period12 months TCO for complete term (net, at 80% power consumption)15400 € Energy costs included in the price as a flat rateYes Connection / cooling capacity per rack5 kW
One-time setup costs: € 1600.00 net Colocation rack offer: High-quality 19 "server and network cabinet with 47 height units (HU), secured by a lock. Available in the dimensions 600/800 x 1,200 (W x D mm). Electrical power consumption from 3 kW to 8 kW per colocation rack can be...
Location:

Deployment timedepends on availability Werktage Contract period24 months TCO for complete term (net, at 80% power consumption)15400 € Energy costs included in the price as a flat rateYes Connection / cooling capacity per rack3 kW
1150,00  (1368,50  inc tax)
In stock
One-time setup costs: € 1200.00 net Colocation rack offer: High-quality 19 "server and network cabinet with 47 height units (HU), secured by a lock. Available in the dimensions 600/800 x 1,200 (W x D mm). Electrical power consumption from 3 kW to 8 kW per colocation rack can be...
Location:

Deployment timedepends on availability Werktage Contract period36 months TCO for complete term (net, at 80% power consumption)15400 € Energy costs included in the price as a flat rateYes Connection / cooling capacity per rack4 kW
One-time setup costs: € 1600.00 net Colocation rack offer: High-quality 19 "server and network cabinet with 47 height units (HU), secured by a lock. Available in the dimensions 600/800 x 1,200 (W x D mm). Electrical power consumption from 3 kW to 8 kW per colocation rack can be...
Location:

Deployment timedepends on availability Werktage Contract period24 months TCO for complete term (net, at 80% power consumption)15400 € Energy costs included in the price as a flat rateYes Connection / cooling capacity per rack4 kW
One-time setup costs: € 1200.00 net Colocation rack offer: High-quality 19 "server and network cabinet with 47 height units (HU), secured by a lock. Available in the dimensions 600/800 x 1,200 (W x D mm). Electrical power consumption from 3 kW to 8 kW per colocation rack can be...
Location:

Deployment timedepends on availability Werktage Contract period60 months TCO for complete term (net, at 80% power consumption)15400 € Energy costs included in the price as a flat rateYes Connection / cooling capacity per rack3 kW
1150,00  (1368,50  inc tax)
In stock
One-time setup costs: € 1600.00 net Colocation rack offer: High-quality 19 "server and network cabinet with 47 height units (HU), secured by a lock. Available in the dimensions 600/800 x 1,200 (W x D mm). Electrical power consumption from 3 kW to 8 kW per colocation rack can be...
Location:

Deployment timedepends on availability Werktage Contract period12 months TCO for complete term (net, at 80% power consumption)15400 € Energy costs included in the price as a flat rateYes Connection / cooling capacity per rack4 kW
One-time setup costs: € 1200.00 net Colocation rack offer: High-quality 19 "server and network cabinet with 47 height units (HU), secured by a lock. Available in the dimensions 600/800 x 1,200 (W x D mm). Electrical power consumption from 3 kW to 8 kW per colocation rack can be...
Location:

Deployment timedepends on availability Werktage Contract period36 months TCO for complete term (net, at 80% power consumption)15400 € Energy costs included in the price as a flat rateYes Connection / cooling capacity per rack3 kW
One-time setup costs: € 1200.00 net Colocation rack offer: High-quality 19 "server and network cabinet with 47 height units (HU), secured by a lock. Available in the dimensions 600/800 x 1,200 (W x D mm). Electrical power consumption from 3 kW to 8 kW per colocation rack can be...
Location:

Deployment timedepends on availability Werktage Contract period60 months TCO for complete term (net, at 80% power consumption)15400 € Energy costs included in the price as a flat rateYes Connection / cooling capacity per rack4 kW

Presentations

Unternehmenspräsentation
Download

Certificates & References

Prüfbescheinigungen und Zertifizierungen Datacenter München 2
Download

News

Einer der weltweit erfolgreichsten SAP-Dienstleister, die itelligence | NTT DATA Business Solutions steigert seine Nachhaltigkeit durch den...
Global Data Centers, ein Geschäftsbereich von NTT Ltd. , einem weltweit führenden Technologiedienstleister, kündigt heute zwei neue Bauprojekte in Berlin an: den Baubeginn des neuen Rechenzentrumscampus Berlin 2 sowie die Erweiterung des Standorts Berlin 1 .
Rechenzentrum der Global Data Centers Division von NTT Ltd. wird „DE-CIX Enabled Site“ Hattersheim/München – 18. November 2020 – Das jüngst...

NTT Global Data Centers EMEA GmbH

Voltastraße 15
Hattersheim am Main
65795
Ask a question
0
%
Criteria Average rating Count of ratings
How reliable is the vendor?
How is the communicatin with the vendor?
How transparent is the vendor?
How fair is the vendor?

No posts found