Items marked by the "Colocation" tag:

Products
we are the centron
Location:

Deployment time2 weeks Werktage Contract period12 months TCO for complete term (net, at 80% power consumption)18142 € Energy costs per kWh00:25 € / kW/h Energy costs included in the price as a flat rateNo
999,00 € 838,60  (997,93  inc tax) You save net: 160,40 €
In stock
we are the centron
Location:

Deployment time2 weeks Werktage Contract period12 months TCO for complete term (net, at 80% power consumption)14422 € Energy costs per kWh00:25 € / kW/h Energy costs included in the price as a flat rateNo
699,00 € 418,60  (498,13  inc tax) You save net: 280,40 €
In stock
NewTelco 's strategically located data centers offer highly flexible equipment housing (from unit to dedicated cage), providing our customers with direct access to the largest European telecommunication hub and 450+ network operators, ISPs, content providers and other telcos. NewTelco has its own advanced data centers in Frankfurt am Main (Germany), Kiev (Ukraine) and Tbilisi (Georgia). The services are available at the most important telecom locations around the globe, including Amsterdam, Hong Kong, London, Stockholm, Vienna, etc.
Location:

Deployment time1 to 3 working days Werktage Contract period12 months TCO for complete term (net, at 80% power consumption)9343 € Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo
600,00  (714,00  inc tax)
In stock
NewTelco 's strategically located data centers offer highly flexible equipment housing (from unit to dedicated cage), providing our customers with direct access to the largest European telecommunication hub and 450+ network operators, ISPs, content providers and other telcos. NewTelco has its own advanced data centers in Frankfurt am Main (Germany), Kiev (Ukraine) and Tbilisi (Georgia). The services are available at the most important telecom locations around the globe, including Amsterdam, Hong Kong, London, Stockholm, Vienna, etc.
Location:

Deployment time1 to 3 working days Werktage Contract period12 months TCO for complete term (net, at 80% power consumption)19328 € Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo
1200,00  (1428,00  inc tax)
In stock
NewTelco 's strategically located data centers offer highly flexible equipment housing (from unit to dedicated cage), providing our customers with direct access to the largest European telecommunication hub and 450+ network operators, ISPs, content providers and other telcos. NewTelco has its own advanced data centers in Frankfurt am Main (Germany), Kiev (Ukraine) and Tbilisi (Georgia). The services are available at the most important telecom locations around the globe, including Amsterdam, Hong Kong, London, Stockholm, Vienna, etc.
Location:

Deployment time1 to 3 working days Werktage Contract period12 months TCO for complete term (net, at 80% power consumption)19328 € Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo
1200,00  (1428,00  inc tax)
In stock
The highly available comtrance colocation data center in Connecta Parc in Düsseldorf - Eller offers companies and resellers the opportunity to rent IT racks or private data center space in the highly secure colocation area and operate them themselves. Our highlights: Secure hosting...
Location:

Deployment time1 to 3 working days Werktage Contract period6 months Connection / cooling capacity per rack4 kW
Contact us for a price
In stock
From simply flicking a switch to installing and configuring sophisticated hard and software solutions, NewTelco team of highly-qualified technicians and engineers is available around the clock to personally take care of customer's IT and telecommunications infrastructure.
Location:

89,00  (105,91  inc tax)
In stock
Wavelength and VLAN to Frankfurt and Düsseldorf on request. Trusted-Colo GmbH & Co. KG has been operating its own data center since 2020 in Alsbach-Hähnlein in southern Hesse. The location is easily accessible via the A5, A67 and B3. The data center is designed as TIER III +....
Location:

Deployment time1 to 3 working days Werktage Contract period6 months TCO for complete term (net, at 80% power consumption)5648 € Energy costs per kWh00:25 € / kW/h Energy costs included in the price as a flat rateNo
495,00  (589,05  inc tax)
In stock
NewTelco 's strategically located data centers offer highly flexible equipment housing (from unit to dedicated cage), providing our customers with direct access to the largest European telecommunication hub and 450+ network operators, ISPs, content providers and other telcos. NewTelco has its own advanced data centers in Frankfurt am Main (Germany), Kiev (Ukraine) and Tbilisi (Georgia). The services are available at the most important telecom locations around the globe, including Amsterdam, Hong Kong, London, Stockholm, Vienna, etc.
Location:

Deployment time1 to 3 working days Werktage Contract period12 months TCO for complete term (net, at 80% power consumption)9343 € Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo
600,00  (714,00  inc tax)
In stock
NewTelco 's strategically located data centers offer highly flexible equipment housing (from unit to dedicated cage), providing our customers with direct access to the largest European telecommunication hub and 450+ network operators, ISPs, content providers and other telcos. NewTelco has its own advanced data centers in Frankfurt am Main (Germany), Kiev (Ukraine) and Tbilisi (Georgia). The services are available at the most important telecom locations around the globe, including Amsterdam, Hong Kong, London, Stockholm, Vienna, etc.
Location:

Deployment time1 to 3 working days Werktage Contract period12 months TCO for complete term (net, at 80% power consumption)19328 € Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo
1200,00  (1428,00  inc tax)
In stock
NewTelco 's strategically located data centers offer highly flexible equipment housing (from unit to dedicated cage), providing our customers with direct access to the largest European telecommunication hub and 450+ network operators, ISPs, content providers and other telcos. NewTelco has its own advanced data centers in Frankfurt am Main (Germany), Kiev (Ukraine) and Tbilisi (Georgia). The services are available at the most important telecom locations around the globe, including Amsterdam, Hong Kong, London, Stockholm, Vienna, etc.
Location:

Deployment time1 to 3 working days Werktage Contract period12 months TCO for complete term (net, at 80% power consumption)19328 € Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo
1200,00  (1428,00  inc tax)
In stock
Separately closed rack with 12 height units in our data center in Nuremberg - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class...
Location:

Deployment time2 weeks Werktage Contract period12 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack1 kW
367,00  (436,73  inc tax)
In stock
Separately closed rack with 12 height units in our data center in Munich - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class -...
Location:

Deployment time2 weeks Werktage Contract period12 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack1 kW
367,00  (436,73  inc tax)
In stock
Separately closed rack with 12 height units in our data center in Nuremberg - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class...
Location:

Deployment time2 weeks Werktage Contract period24 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo
333,00  (396,27  inc tax)
In stock
Separately closed rack with 12 height units in our data center in Munich - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class -...
Location:

Deployment time2 weeks Werktage Contract period24 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack1 kW
333,00  (396,27  inc tax)
In stock
Separately closed rack with 12 height units in our data center in Nuremberg - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class...
Location:

Deployment time2 weeks Werktage Contract period36 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo
300,00  (357,00  inc tax)
In stock
Separately closed rack with 12 height units in our data center in Munich - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class -...
Location:

Deployment time2 weeks Werktage Contract period36 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack1 kW
300,00  (357,00  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Nuremberg - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class...
Location:

Deployment time2 weeks Werktage Contract period12 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack2 kW
594,00  (706,86  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Munich - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class -...
Location:

Deployment time2 weeks Werktage Contract period12 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack2 kW
594,00  (706,86  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Munich - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class -...
Location:

Deployment time2 weeks Werktage Contract period12 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack3 kW
708,00  (842,52  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Nuremberg - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class...
Location:

Deployment time2 weeks Werktage Contract period12 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack3 kW
708,00  (842,52  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Nuremberg - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class...
Location:

Deployment time2 weeks Werktage Contract period12 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack4 kW
822,00  (978,18  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Munich - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class -...
Location:

Deployment time2 weeks Werktage Contract period12 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack4 kW
822,00  (978,18  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Munich - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class -...
Location:

Deployment time2 weeks Werktage Contract period12 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack5 kW
936,00  (1113,84  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Nuremberg - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class...
Location:

Deployment time2 weeks Werktage Contract period12 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack5 kW
936,00  (1113,84  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Nuremberg - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class...
Location:

Deployment time2 weeks Werktage Contract period12 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack6 kW
1050,00  (1249,50  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Munich - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class -...
Location:

Deployment time2 weeks Werktage Contract period12 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack6 kW
1050,00  (1249,50  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Nuremberg - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class...
Location:

Deployment time2 weeks Werktage Contract period24 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack2 kW
531,00  (631,89  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Munich - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class -...
Location:

Deployment time2 weeks Werktage Contract period24 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack2 kW
531,00  (631,89  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Munich - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class -...
Location:

Deployment time2 weeks Werktage Contract period24 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack3 kW
635,00  (755,65  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Nuremberg - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class...
Location:

Deployment time2 weeks Werktage Contract period24 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack3 kW
635,00  (755,65  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Munich - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class -...
Location:

Deployment time2 weeks Werktage Contract period24 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack4 kW
740,00  (880,60  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Nuremberg - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class...
Location:

Deployment time2 weeks Werktage Contract period24 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack4 kW
740,00  (880,60  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Munich - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class -...
Location:

Deployment time2 weeks Werktage Contract period24 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack5 kW
844,50 € 844,00  (1004,36  inc tax) You save net: 0,50 €
In stock
Separately closed rack with 46 height units in our data center in Nuremberg - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class...
Location:

Deployment time2 weeks Werktage Contract period24 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack5 kW
844,50 € 844,00  (1004,36  inc tax) You save net: 0,50 €
In stock
Separately closed rack with 46 height units in our data center in Nuremberg - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class...
Location:

Deployment time2 weeks Werktage Contract period24 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack6 kW
949,00  (1129,31  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Munich - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class -...
Location:

Deployment time2 weeks Werktage Contract period24 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack6 kW
949,00  (1129,31  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Nuremberg - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class...
Location:

Deployment time3 weeks Werktage Contract period36 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack2 kW
480,00 € 430,00  (511,70  inc tax) You save net: 50,00 €
In stock
Separately closed rack with 46 height units in our data center in Munich - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class -...
Location:

Deployment time2 weeks Werktage Contract period36 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack2 kW
480,00  (571,20  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Nuremberg - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class...
Location:

Deployment time2 weeks Werktage Contract period36 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack3 kW
575,00  (684,25  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Munich - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class -...
Location:

Deployment time2 weeks Werktage Contract period36 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack3 kW
575,00  (684,25  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Nuremberg - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class...
Location:

Deployment time2 weeks Werktage Contract period36 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack4 kW
670,00  (797,30  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Munich - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class -...
Location:

Deployment time2 weeks Werktage Contract period36 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack4 kW
670,00  (797,30  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Nuremberg - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class...
Location:

Deployment time2 weeks Werktage Contract period36 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack5 kW
765,00  (910,35  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Munich - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class -...
Location:

Deployment time2 weeks Werktage Contract period36 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack5 kW
765,00  (910,35  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Nuremberg - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class...
Location:

Deployment time2 weeks Werktage Contract period36 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack6 kW
860,00  (1023,40  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Munich - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class -...
Location:

Deployment time2 weeks Werktage Contract period36 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack6 kW
860,00  (1023,40  inc tax)
In stock
Separately closed rack with 10 height units in our data center in Munich - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class -...
Location:

Deployment time2 weeks Werktage Contract period12 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack0.5 kW
294,00  (349,86  inc tax)
In stock
Separately closed rack with 10 height units in our data center in Nuremberg - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class...
Location:

Deployment time2 weeks Werktage Contract period12 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack0.5 kW
294,00  (349,86  inc tax)
In stock
Separately closed rack with 10 height units in our data center in Nuremberg - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class...
Location:

Deployment time2 weeks Werktage Contract period24 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack0.5 kW
267,00  (317,73  inc tax)
In stock
Articles
ass = "uvc-sub-heading ult-responsive" style = "font-weight: normal;"> High Performance Computing (HPC) places high demands on the data center...
Companies STACKIT is the digital umbrella brand of the Schwarz Group for IT services. STACKIT is backed by Schwarz IT KG as the central...
Our service is our corporate philosophy Long-standing customers can confirm: Our experienced technicians are always there when...
NewTelco – Ihre erste Wahl für Geräte-Housing und außergewöhnliche Carrier-Verbindungen. NewTelco ist ein auf das Telekommunikations-Segment...
Wer rechnet, heizt richtig – und das im wortwörtlichen Sinn. Die Basler Energieversorgerin IWB installiert dezentrale Rechenzentren in...
Die Trusted-Colo GmbH & Co. KG betreibt seit 2020 ein eigenes Rechenzentrum im hessischen Alsbach-Hähnlein.
So wird nachhaltige Digitalisierung wirtschaftlich: Die Colocation-Lösungen von Windcloud Beim CO2-freien Rechenzentrumsbetreiber profitieren...
comtrance ist ein deutsches, inhabergeführtes Unternehmen und agiert als IT-Lösungsanbieter und Rechenzentrumsbetreiber mit einer Historie seit...
CBXNET vertreibt Colocation Leistungen auf dcOrbis. Dabei bietet CBXNET über dcOrbis die Möglichkeit, ganze, 1/2 oder 1/4 Racks in unabhängigen...
Equinix und der globale Internet Exchange Betreiber DE-CIX kooperieren nun auch in Hamburg. Equinix, Inc . (Nasdaq: EQIX), das globale...
Rechenzentrum der Global Data Centers Division von NTT Ltd. wird „DE-CIX Enabled Site“ Hattersheim/München – 18. November 2020 – Das jüngst...
Teliko bietet ihren Kunden maßgeschneiderte Lösungen rund um Internet und Telefonie sowie Datenverbindungen und Rechenzentrums-Dienstleistungen....
Neues Public-Cloud-Angebot ist vollständig Open Source und basiert auf dem Sovereign Cloud Stack, der Teil von GAIA‑X ist Kunden erhalten eine...
Global Data Centers, ein Geschäftsbereich von NTT Ltd. , einem weltweit führenden Technologiedienstleister, kündigt heute zwei neue Bauprojekte in Berlin an: den Baubeginn des neuen Rechenzentrumscampus Berlin 2 sowie die Erweiterung des Standorts Berlin 1 .
Zertifizierung KÜS DATA Rechenzentrum nach ISO 27001 Eines der fortschrittlichsten und sichersten Rechenzentren im Südwesten Das Rechenzentrum...
KÜS DATA steht für die Bereit­haltung umfassender Lösungen in Sachen IT-Sicherheit. Mit vielen Jahren Erfahrung als IT-Dienstleister der...
Mit conova entscheidet sich ein weiterer Anbieter für dcOrbis! conova ist Ihr langfristiger strategischer Partner für den hochverfügbaren und...
Einer der weltweit erfolgreichsten SAP-Dienstleister, die itelligence | NTT DATA Business Solutions steigert seine Nachhaltigkeit durch den...
Ob klassische Rechenzentrums-Services wie Racks und Cages oder Virtual-Datacenter-Leistungen für optimale Skalierbarkeit und Flexibilität: In...
Die PFALZKOM GmbH betreibt TÜV-zertifizierte, hochverfügbare Rechenzentren in der Region Rhein-Main-Neckar, moderne Glasfasernetze bis nach...
dotManaged entscheidet sich für dcOrbis Sie möchten Ihre Server in einem carrierneutralen Rechenzentrum mit beinahe endlosen...