One-time setup costs: € 1200.00 net Colocation rack offer: High-quality 19 "server and network cabinet with 47 height units (HU), secured by a lock. Available in the dimensions 600/800 x 1,200 (W x D mm). Electrical power consumption from 3 kW to 8 kW per colocation rack can be...
Location:

Landshuter Str. 7, 85716 Unterschleißheim, Deutschland

Deployment timedepends on availability Werktage Contract period36 months TCO for complete term (net, at 80% power consumption)15400 € Energy costs included in the price as a flat rateYes Connection / cooling capacity per rack5 kW
we are the centron
Location:

Heganger, 96103 Hallstadt, Deutschland

Deployment time2 weeks Werktage Contract period12 months TCO for complete term (net, at 80% power consumption)18142 € Energy costs per kWh00:25 € / kW/h Energy costs included in the price as a flat rateNo
999,00 € 838,60  (997,93  inc tax) You save net: 160,40 €
In stock
we are the centron
Location:

Heganger, 96103 Hallstadt, Deutschland

Deployment time2 weeks Werktage Contract period12 months TCO for complete term (net, at 80% power consumption)14422 € Energy costs per kWh00:25 € / kW/h Energy costs included in the price as a flat rateNo
699,00 € 418,60  (498,13  inc tax) You save net: 280,40 €
In stock
DC10 - Easter renting Server room / rack Construction phase 1: up to 1,000 m² of rental space, 500 m² of which are equipped with 160 racks and PDUs, and 500 m² can be configured on customer request. Construction phase 2: Another 4,500 m² server room capacity can be planned...
Location:

Deployment time2 weeks Werktage Energy costs per kWh00:16 € / kW/h Energy costs included in the price as a flat rateNo
Contact us for a price
In stock