Items marked by the "Rack" tag:

Products
One-time setup costs: € 1600.00 net Colocation rack offer: High-quality 19 "server and network cabinet with 47 height units (HU), secured by a lock. Available in the dimensions 600/800 x 1,200 (W x D mm). Electrical power consumption from 3 kW to 8 kW per colocation rack can be...
Location:

Deployment timedepends on availability Werktage Contract period12 months TCO for complete term (net, at 80% power consumption)15400 € Energy costs included in the price as a flat rateYes Connection / cooling capacity per rack5 kW
One-time setup costs: € 1600.00 net Colocation rack offer: High-quality 19 "server and network cabinet with 47 height units (HU), secured by a lock. Available in the dimensions 600/800 x 1,200 (W x D mm). Electrical power consumption from 3 kW to 8 kW per colocation rack can be...
Location:

Deployment timedepends on availability Werktage Contract period24 months TCO for complete term (net, at 80% power consumption)15400 € Energy costs included in the price as a flat rateYes Connection / cooling capacity per rack5 kW
One-time setup costs: € 1200.00 net Colocation rack offer: High-quality 19 "server and network cabinet with 47 height units (HU), secured by a lock. Available in the dimensions 600/800 x 1,200 (W x D mm). Electrical power consumption from 3 kW to 8 kW per colocation rack can be...
Location:

Deployment timedepends on availability Werktage Contract period36 months TCO for complete term (net, at 80% power consumption)15400 € Energy costs included in the price as a flat rateYes Connection / cooling capacity per rack5 kW
One-time setup costs: € 1600.00 net Colocation rack offer: High-quality 19 "server and network cabinet with 47 height units (HU), secured by a lock. Available in the dimensions 600/800 x 1,200 (W x D mm). Electrical power consumption from 3 kW to 8 kW per colocation rack can be...
Location:

Deployment timedepends on availability Werktage Contract period12 months TCO for complete term (net, at 80% power consumption)15400 € Energy costs included in the price as a flat rateYes Connection / cooling capacity per rack4 kW
One-time setup costs: € 1600.00 net Colocation rack offer: High-quality 19 "server and network cabinet with 47 height units (HU), secured by a lock. Available in the dimensions 600/800 x 1,200 (W x D mm). Electrical power consumption from 3 kW to 8 kW per colocation rack can be...
Location:

Deployment timedepends on availability Werktage Contract period24 months TCO for complete term (net, at 80% power consumption)15400 € Energy costs included in the price as a flat rateYes Connection / cooling capacity per rack4 kW
One-time setup costs: € 1200.00 net Colocation rack offer: High-quality 19 "server and network cabinet with 47 height units (HU), secured by a lock. Available in the dimensions 600/800 x 1,200 (W x D mm). Electrical power consumption from 3 kW to 8 kW per colocation rack can be...
Location:

Deployment timedepends on availability Werktage Contract period36 months TCO for complete term (net, at 80% power consumption)15400 € Energy costs included in the price as a flat rateYes Connection / cooling capacity per rack4 kW
One-time setup costs: € 1200.00 net Colocation rack offer: High-quality 19 "server and network cabinet with 47 height units (HU), secured by a lock. Available in the dimensions 600/800 x 1,200 (W x D mm). Electrical power consumption from 3 kW to 8 kW per colocation rack can be...
Location:

Deployment timedepends on availability Werktage Contract period60 months TCO for complete term (net, at 80% power consumption)15400 € Energy costs included in the price as a flat rateYes Connection / cooling capacity per rack4 kW
NewTelco 's strategically located data centers offer highly flexible equipment housing (from unit to dedicated cage), providing our customers with direct access to the largest European telecommunication hub and 450+ network operators, ISPs, content providers and other telcos. NewTelco has its own advanced data centers in Frankfurt am Main (Germany), Kiev (Ukraine) and Tbilisi (Georgia). The services are available at the most important telecom locations around the globe, including Amsterdam, Hong Kong, London, Stockholm, Vienna, etc.
Location:

Deployment time1 to 3 working days Werktage Contract period12 months TCO for complete term (net, at 80% power consumption)19328 € Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo
1200,00  (1428,00  inc tax)
In stock
NewTelco 's strategically located data centers offer highly flexible equipment housing (from unit to dedicated cage), providing our customers with direct access to the largest European telecommunication hub and 450+ network operators, ISPs, content providers and other telcos. NewTelco has its own advanced data centers in Frankfurt am Main (Germany), Kiev (Ukraine) and Tbilisi (Georgia). The services are available at the most important telecom locations around the globe, including Amsterdam, Hong Kong, London, Stockholm, Vienna, etc.
Location:

Deployment time1 to 3 working days Werktage Contract period12 months TCO for complete term (net, at 80% power consumption)19328 € Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo
1200,00  (1428,00  inc tax)
In stock
NewTelco 's strategically located data centers offer highly flexible equipment housing (from unit to dedicated cage), providing our customers with direct access to the largest European telecommunication hub and 450+ network operators, ISPs, content providers and other telcos. NewTelco has its own advanced data centers in Frankfurt am Main (Germany), Kiev (Ukraine) and Tbilisi (Georgia). The services are available at the most important telecom locations around the globe, including Amsterdam, Hong Kong, London, Stockholm, Vienna, etc.
Location:

Deployment time1 to 3 working days Werktage Contract period12 months TCO for complete term (net, at 80% power consumption)19328 € Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo
1200,00  (1428,00  inc tax)
In stock
NewTelco 's strategically located data centers offer highly flexible equipment housing (from unit to dedicated cage), providing our customers with direct access to the largest European telecommunication hub and 450+ network operators, ISPs, content providers and other telcos. NewTelco has its own advanced data centers in Frankfurt am Main (Germany), Kiev (Ukraine) and Tbilisi (Georgia). The services are available at the most important telecom locations around the globe, including Amsterdam, Hong Kong, London, Stockholm, Vienna, etc.
Location:

Deployment time1 to 3 working days Werktage Contract period12 months TCO for complete term (net, at 80% power consumption)19328 € Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo
1200,00  (1428,00  inc tax)
In stock
One-time setup costs: € 1600.00 net Colocation rack offer: High-quality 19 "server and network cabinet with 47 height units (HU), secured by a lock. Available in the dimensions 600/800 x 1,200 (W x D mm). Electrical power consumption from 3 kW to 8 kW per colocation rack can be...
Location:

Deployment timedepends on availability Werktage Contract period12 months TCO for complete term (net, at 80% power consumption)15400 € Energy costs included in the price as a flat rateYes Connection / cooling capacity per rack3 kW
1150,00  (1368,50  inc tax)
In stock
One-time setup costs: € 1600.00 net Colocation rack offer: High-quality 19 "server and network cabinet with 47 height units (HU), secured by a lock. Available in the dimensions 600/800 x 1,200 (W x D mm). Electrical power consumption from 3 kW to 8 kW per colocation rack can be...
Location:

Deployment timedepends on availability Werktage Contract period24 months TCO for complete term (net, at 80% power consumption)15400 € Energy costs included in the price as a flat rateYes Connection / cooling capacity per rack3 kW
1150,00  (1368,50  inc tax)
In stock
One-time setup costs: € 1200.00 net Colocation rack offer: High-quality 19 "server and network cabinet with 47 height units (HU), secured by a lock. Available in the dimensions 600/800 x 1,200 (W x D mm). Electrical power consumption from 3 kW to 8 kW per colocation rack can be...
Location:

Deployment timedepends on availability Werktage Contract period36 months TCO for complete term (net, at 80% power consumption)15400 € Energy costs included in the price as a flat rateYes Connection / cooling capacity per rack3 kW
One-time setup costs: € 1200.00 net Colocation rack offer: High-quality 19 "server and network cabinet with 47 height units (HU), secured by a lock. Available in the dimensions 600/800 x 1,200 (W x D mm). Electrical power consumption from 3 kW to 8 kW per colocation rack can be...
Location:

Deployment timedepends on availability Werktage Contract period60 months TCO for complete term (net, at 80% power consumption)15400 € Energy costs included in the price as a flat rateYes Connection / cooling capacity per rack3 kW
1150,00  (1368,50  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Munich - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class -...
Location:

Deployment time2 weeks Werktage Contract period12 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack6 kW
1050,00  (1249,50  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Nuremberg - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class...
Location:

Deployment time2 weeks Werktage Contract period12 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack6 kW
1050,00  (1249,50  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Munich - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class -...
Location:

Deployment time2 weeks Werktage Contract period24 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack6 kW
949,00  (1129,31  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Nuremberg - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class...
Location:

Deployment time2 weeks Werktage Contract period24 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack6 kW
949,00  (1129,31  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Nuremberg - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class...
Location:

Deployment time2 weeks Werktage Contract period12 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack5 kW
936,00  (1113,84  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Munich - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class -...
Location:

Deployment time2 weeks Werktage Contract period12 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack5 kW
936,00  (1113,84  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Munich - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class -...
Location:

Deployment time2 weeks Werktage Contract period36 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack6 kW
860,00  (1023,40  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Nuremberg - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class...
Location:

Deployment time2 weeks Werktage Contract period36 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack6 kW
860,00  (1023,40  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Nuremberg - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class...
Location:

Deployment time2 weeks Werktage Contract period24 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack5 kW
844,50 € 844,00  (1004,36  inc tax) You save net: 0,50 €
In stock
Separately closed rack with 46 height units in our data center in Munich - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class -...
Location:

Deployment time2 weeks Werktage Contract period24 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack5 kW
844,50 € 844,00  (1004,36  inc tax) You save net: 0,50 €
In stock
Separately closed rack with 46 height units in our data center in Nuremberg - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class...
Location:

Deployment time2 weeks Werktage Contract period12 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack4 kW
822,00  (978,18  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Munich - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class -...
Location:

Deployment time2 weeks Werktage Contract period12 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack4 kW
822,00  (978,18  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Nuremberg - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class...
Location:

Deployment time2 weeks Werktage Contract period36 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack5 kW
765,00  (910,35  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Munich - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class -...
Location:

Deployment time2 weeks Werktage Contract period36 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack5 kW
765,00  (910,35  inc tax)
In stock
82261
Location:

665,00  (791,35  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Nuremberg - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class...
Location:

Deployment time2 weeks Werktage Contract period24 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack4 kW
740,00  (880,60  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Munich - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class -...
Location:

Deployment time2 weeks Werktage Contract period24 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack4 kW
740,00  (880,60  inc tax)
In stock
NewTelco 's strategically located data centers offer highly flexible equipment housing (from unit to dedicated cage), providing our customers with direct access to the largest European telecommunication hub and 450+ network operators, ISPs, content providers and other telcos. NewTelco has its own advanced data centers in Frankfurt am Main (Germany), Kiev (Ukraine) and Tbilisi (Georgia). The services are available at the most important telecom locations around the globe, including Amsterdam, Hong Kong, London, Stockholm, Vienna, etc.
Location:

Deployment time1 to 3 working days Werktage Contract period12 months TCO for complete term (net, at 80% power consumption)9343 € Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo
600,00  (714,00  inc tax)
In stock
NewTelco 's strategically located data centers offer highly flexible equipment housing (from unit to dedicated cage), providing our customers with direct access to the largest European telecommunication hub and 450+ network operators, ISPs, content providers and other telcos. NewTelco has its own advanced data centers in Frankfurt am Main (Germany), Kiev (Ukraine) and Tbilisi (Georgia). The services are available at the most important telecom locations around the globe, including Amsterdam, Hong Kong, London, Stockholm, Vienna, etc.
Location:

Deployment time1 to 3 working days Werktage Contract period12 months TCO for complete term (net, at 80% power consumption)9343 € Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo
600,00  (714,00  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Nuremberg - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class...
Location:

Deployment time2 weeks Werktage Contract period12 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack3 kW
708,00  (842,52  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Munich - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class -...
Location:

Deployment time2 weeks Werktage Contract period12 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack3 kW
708,00  (842,52  inc tax)
In stock
we are the centron
Location:

Deployment time2 weeks Werktage Contract period12 months TCO for complete term (net, at 80% power consumption)18142 € Energy costs per kWh00:25 € / kW/h Energy costs included in the price as a flat rateNo
999,00 € 838,60  (997,93  inc tax) You save net: 160,40 €
In stock
One-time setup costs: € 799.00 Whether for business or pleasure - if the digital infrastructure fails, you will feel the consequences directly. You need a strong partner to keep your data safe and to have access to it at all times. The KÜS-DATA data center is one of the most secure in Germany...
Location:

Deployment time1 week Werktage Contract period12 months TCO for complete term (net, at 80% power consumption)13987 € Energy costs per kWh00:28 € / kW/h Energy costs included in the price as a flat rateNo
Separately closed rack with 46 height units in our data center in Nuremberg - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class...
Location:

Deployment time2 weeks Werktage Contract period36 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack4 kW
670,00  (797,30  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Munich - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class -...
Location:

Deployment time2 weeks Werktage Contract period36 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack4 kW
670,00  (797,30  inc tax)
In stock
One-time setup costs: € 799.00 Whether for business or pleasure - if the digital infrastructure fails, you will feel the consequences directly. You need a strong partner to keep your data safe and to have access to it at all times. The KÜS-DATA data center is one of the most secure in Germany...
Location:

Deployment time1 week Werktage Contract period24 months TCO for complete term (net, at 80% power consumption)25974 € Energy costs per kWh00:28 € / kW/h Energy costs included in the price as a flat rateNo
Separately closed rack with 46 height units in our data center in Nuremberg - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class...
Location:

Deployment time2 weeks Werktage Contract period24 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack3 kW
635,00  (755,65  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Munich - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class -...
Location:

Deployment time2 weeks Werktage Contract period24 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack3 kW
635,00  (755,65  inc tax)
In stock
82211
Location:

505,00  (600,95  inc tax)
In stock
One-time setup costs: € 799.00 Whether for business or pleasure - if the digital infrastructure fails, you will feel the consequences directly. You need a strong partner to keep your data safe and to have access to it at all times. The KÜS-DATA data center is one of the most secure in Germany...
Location:

Deployment time1 week Werktage Contract period36 months TCO for complete term (net, at 80% power consumption)36762 € Energy costs per kWh00:28 € / kW/h Energy costs included in the price as a flat rateNo
499,00  (593,81  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Nuremberg - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class...
Location:

Deployment time2 weeks Werktage Contract period12 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack2 kW
594,00  (706,86  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Munich - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class -...
Location:

Deployment time2 weeks Werktage Contract period12 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack2 kW
594,00  (706,86  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Nuremberg - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class...
Location:

Deployment time2 weeks Werktage Contract period36 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack3 kW
575,00  (684,25  inc tax)
In stock
Separately closed rack with 46 height units in our data center in Munich - cabinet depth 1000 mm (1200 mm on request) - maximum installation depth 800 mm - Cabinet width 600 mm (800 mm on request) - Cooling capacity and power connection correspond to the booked performance class -...
Location:

Deployment time2 weeks Werktage Contract period36 months Energy costs per kWh00:30 € / kW/h Energy costs included in the price as a flat rateNo Connection / cooling capacity per rack3 kW
575,00  (684,25  inc tax)
In stock
One-time setup costs: € 799.00 Whether for business or pleasure - if the digital infrastructure fails, you will feel the consequences directly. You need a strong partner to keep your data safe and to have access to it at all times. The KÜS-DATA data center is one of the most secure in Germany...
Location:

Deployment time1 week Werktage Contract period60 months TCO for complete term (net, at 80% power consumption)57737 € Energy costs per kWh00:28 € / kW/h Energy costs included in the price as a flat rateNo
Articles
Physische Gefahren im Rack minimieren  Kentix veröffentlicht neue SmartPDU als All-in-One-Lösung zur Absicherung von Server-Schränken  Neue...
Our service is our corporate philosophy Long-standing customers can confirm: Our experienced technicians are always there when...
Companies STACKIT is the digital umbrella brand of the Schwarz Group for IT services. STACKIT is backed by Schwarz IT KG as the central...
ass = "uvc-sub-heading ult-responsive" style = "font-weight: normal;"> High Performance Computing (HPC) places high demands on the data center...