CBXNET Compartment 8U (quarter rack) Colocation Rack Berlin 6 months

SH
Rating
220,00 
(261,80  inc tax)
Deployment time3 weeks Werktage Contract period6 months TCO for complete term (net, at 80% power consumption)3292 € Energy costs per kWh00:38 € / kW/h Connection / cooling capacity per rack1 kW
Shipping time and rates:
Vendor rating
Rate vendor
Our advantages
Options
Laufzeitvertrag 6 Monate
220,00 
Monthly
6

Rack housing in Berlin data centers . You benefit from the competence and the strong service of CBXNET. Operation in a CBXNET data center ensures high availability of your applications at attractive conditions and sustainable operating models (Green IT).

19 "rack compartment (quarter rack)

  • 19 "rack height units: 8
  • Rack with door lock
  • Base area: 600 x 800
  • Fully air-conditioned data center
  • 1x 1 Gbit / s network connection
  • inclusive / 29 IPv4 network (IPv6 on request)
  • Network availability: 99.9% pa
  • including 5 TB of data traffic
  • BCiX Connect
  • redundant 10 gigabit data center connection
  • Uninterruptible power supply (UPS)
  • emergency generator
  • 24/7 video surveillance
  • Local rate support hotline (Berlin)
  • independent 24/7 access to the rack
  • Housing in Berlin / Germany including 2 personalized keys for data center access

The two Berlin data center areas are also suitable for high geo-redundant availability requirements of financial service providers and customers from the health sector.

Thanks to air-conditioned server rooms , a central uninterruptible power supply ( UPS ) and a non-toxic gas extinguishing system in the event of a fire, your servers are in the best possible location. Close to the heart of Berlin and optimally connected to the Internet.

With gigabit uplinks and a BCiX Connect , you have the best possible connections to the Internet.

The Berlin Commercial Internet Exchange eV BCIX for short connects local and other large providers at one point where they can exchange traffic data directly. This enables a very fast and efficient connection to other networks from Google, Akamai, Vodafone, German Research Network (DFN)

One-time setup costs: € 615.00 net

Additional services

Additional working hours within office hours (Mon-Fri 9 am-7pm): € 95.00 net per hour or part thereof

Additional working hours outside office hours: € 142.50 net per hour or part thereof

Additional data center key for independent 24/7 access to the rack: € 65.00 net per data center key

Deployment time:
3 weeks Werktage
Contract period:
6 months
TCO for complete term (net, at 80% power consumption):
3292
Data center energy costs (including all charges)
Energy costs per kWh:
00:38 € / kW/h
Data center racks
Connection / cooling capacity per rack:
1 kW
Rack type:
1/4 rack (quarter rack, partition, separate doors)
Rack PDU:
  • Single phase 230V / 16A
Rack depth:
80 cm
Rack width:
60 cm
Rack height (usable U):
8th U
Rack locking system:
Mechanical closure
Rack redundancy power supply:
2N (redundant A + B power supply)
Stromzuführung:
Einphasig 16A
Air conditioning redundancy:
N + 2
PDU A Typ:
Einfache PDU, unmanaged
PDU B Typ:
Einfache PDU, unmanaged
Data center energy efficiency
Operationally measured PUE (12 months):
1.75
Data center sustainability
Electricity from renewable sources:
Source regenerative sources:
Hydropower in the aplen area
Regenerative Energie wird als Zertifikat eingekauft:
Betreiber erzeugt selbst regenerative Energie:
Anteil selbst erzeugter Energie am Gesamtverbrauch:
100 %
Nutzung Abwärme des RZ:
Errichtung des RZ mit nachhaltigen Materialien:
Nachhaltige Materialien zertifiziert:
Used refrigerant:
R407C
Data center SLA
Power availability basis:
Annual mean
Power availability for redundantly connected customers:
99.99 %
Power availability basis:
Annual mean
Guaranteed availability of air conditioning:
99.75 %
Availability of air conditioning base:
Annual mean
Guaranteed supply air temperature minimum:
20th °C
Guaranteed supply air temperature maximum:
28 °C
Guaranteed availability network connection / IP transit:
99.95 %
Availability network connection basis:
Annual mean
General data center
Type of building:
Data center in mixed-use buildings
Construction:
Solid construction (concrete / stone)
storage areas:
parking :
Covered delivery:
Truck loading ramp / lifting table:
Temporary jobs:
Permanent jobs for rent:
Use of meeting rooms possible:
Temporary storage space:
Permanently rentable storage space:
Raised floors in the data center areas:
Soil is dissipative:
Floor area load:
5 kN per m2
Point load floor:
2 kN
Clear room height of IT rooms:
290 cm
Clear height transport routes (minimum) :
200 cm
Data center in airport approach lane:
No
Data center near train tracks:
No
Data center near the motorway:
No, at least 500m away
Data center in floodplain:
No
Data center in earthquake zone:
No
Data center in the vicinity of potentially explosive facilities:
No
Data center close to other hazards:
No
Data center security
Protection / zone concept was implemented:
Burglary protection building outer shell:
No classification
Burglary protection IT rooms:
RC 1
Burglary protection technical operating rooms:
RC 1
Burglary protection security center:
No classification
Fenced off area:
Fence with step over protection:
Fence and gate monitored by sensors:
Fence and gate under video surveillance:
Apron surveillance with video:
Apron monitoring with additional sensors:
Approach protection building:
Burglar alarm system building outer shell:
Burglar alarm system IT areas:
Burglar alarm system technical operating rooms:
Intrusion alarm system for traffic areas:
Video surveillance building outer shell:
Video surveillance IT areas:
Video surveillance of technical operating rooms:
Video surveillance traffic areas:
Separation system / lock building access:
Isolation system / sluice IT rooms:
Separation system / lock technical operating rooms:
Electronic access control system:
Two-factor verification (card + pin, etc):
Biometric verification:
Security Staff:
No security service on site
Security Service on call:
Data center fire protection
Walls of IT rooms:
F90
Doors IT rooms:
T30 RS
Walls of technical operating rooms:
F90
Doors for technical operating rooms:
T30 RS
Wall openings sealed in wall class:
Floor coverings flame-retardant / non-combustible:
Fire alarm system with smoke detectors:
Fire alarm system with combination detectors (smoke, heat):
IT rooms with RAS system (early fire detection):
Technical operating rooms with RAS system (early fire detection):
IT rooms with extinguishing systems or oxygen reduction:
Technical operating rooms with extinguishing system or oxygen reduction:
Switching off the fresh air system in the event of a fire outside the building:
Halogen-free flooring:
Halogen-free cable:
Data center supply infrastructure
Voltage level mains supply:
Medium voltage
Redundancy power grid:
Supply from a substation
Medium voltage supply redundancy:
  • Redundant stitch feed
Medium voltage main distribution redundancy:
N (no redundancy)
Transformer redundancy:
N + 1
Backup redundancy system:
N (no redundancy)
Redundancy of storage tanks:
N
Separate tank for each emergency power system:
Network replacement system fuel supply:
12 to 24 hours of operation
UPS system redundancy:
N + 1
Batteries:
Single strand
Low voltage distributions redundancy:
N (no redundancy)
Sub-distributions / busbars in IT rooms redundancy:
2N
Power rails in IT rooms:
Cable routing from transformer to IT rooms:
Single, no redundancy
Type of air conditioning:
Direct Expansion, ULK / In-Row
Air conditioning redundancy devices:
N + 2
Lightning protection:
Protection class IV
Data center network and connectivity
Network building supply:
Redundant routing, separated structurally and in terms of fire protection
Network cable routing in the building:
Redundant routing, separated structurally and in terms of fire protection
Network distributor / meet-me rooms:
Single, no redundancy
Active network components:
2N
Total IP transit capacity:
30th Gbit/s
Upstream carriers used:
Telia, euNetworks, BCIX
Exchange points that you have connected yourself:
BCIX
Available carriers for Layer 1,2,3 Connectivity:
Telia, Versatel, euNetworks, Telekom, COLT, BCIX, Syseleven
Data center latency times from data center to:
Bratislava:
26th ms
Iceland:
55 ms
Luxembourg:
18th ms
Milan:
19th ms
Moscow:
39 ms
Prague:
21st ms
Stockholm:
29 ms
Vienna:
18th ms
Zurich:
17th ms
Data center hyperscaler connectivity
Amazon AWS:
Bandwidth:
10
Google Cloud Plattform:
Bandwidth:
10
Microsoft Azure:
IBM Bluemix / Softlayer:
VMWare VCloud Air:
Oracle:
Alibaba:
Others:
Akamai
Data center certifications
ISO 9001:
ISO 27001:
ISO 50001:
Data center services
Remote hands (reset, opt. Test, etc.):
  • 24x7
Extended remote hands (reboot, patch, etc.):
24x7
Hardware support (HDD, power supply, etc.):
No hardware support
Atdn. service for service providers:
During business hours
Web tool for tickets and orders:
Acceptance of customer shipments:
Unpacking / packing service, dispatch of goods:
Rack installation of customer equipment:
24x7
Documentation / labeling of devices and cabling:
Web-based documentation system for customers:
Network equipment support:
During business hours
Creation of a service report:
Per month
Other services offered:
Veeam Cloud Connect
Other services offered:
ComBox.syno backup
Other services offered:
Shared firewall
Data center access and staff
Access to the data center:
  • 24h / 7 days

Flyer (2019_CBXNET-Flyer.pdf, 1,221 Kb) [Download]

Factsheet viertel Rack (Factsheet_Compartment_viertel_Rack_CBXNET.pdf, 28 Kb) [Download]

No posts found

0
%
Criteria Average rating Count of ratings
How reliable is the vendor?
How is the communicatin with the vendor?
How transparent is the vendor?
How fair is the vendor?
  • Popular
  • Recently viewed
  • New