Warning Cookies are used on this site to provide the best user experience. If you continue, we assume that you agree to receive cookies from this site. OK

Data Center Space & Cages

subcategories
Colocation Finder - location search
Entfernung

CoLocation Filter Basic

CoLocation Filter Advanced

Server room / Rack Two server rooms in separate fire zones. Available in the data center up to 300 m² of rental space. Redundant power supply per rack. Power consumption between 4 kW and 20 kW per rack. Real-time measurement of electricity consumption. Redundant, needs-based...
Deployment time10 to 12 weeks Werktage Energy costs per kWh00:22 Euro / kW/h
DC10 - Easter renting Server room / Rack Construction phase 1: up to 1,000 m² of rental space, 500 m² of which are equipped with 160 racks and PDUs, and 500 m² can be configured on customer request. Construction phase 2: another 4,500 m² server room capacity can be planned...
Deployment time2 weeks Werktage Energy costs per kWh00:16 Euro / kW/h Energy costs included in the price as a flat rateNo
Server room / Rack Two server rooms in separate fire zones. Available in the data center up to 300 m² of rental space. Redundant power supply per rack. Power consumption between 4 kW and 20 kW per rack. Real-time measurement of electricity consumption. Redundant, needs-based...
Deployment time10 to 12 weeks Werktage Energy costs per kWh00:22 Euro / kW/h
DC10 - Easter renting Server room / Rack Construction phase 1: up to 1,000 m² of rental space, 500 m² of which are equipped with 160 racks and PDUs, and 500 m² can be configured on customer request. Construction phase 2: another 4,500 m² server room capacity can be planned...
Deployment time2 weeks Werktage Energy costs per kWh00:16 Euro / kW/h Energy costs included in the price as a flat rateNo