Warning Cookies are used on this site to provide the best user experience. If you continue, we assume that you agree to receive cookies from this site. OK

Colocation Racks & Whitespace

CoLocation Filter Basic

DC10 - Easter renting Server room / Rack Construction phase 1: up to 1,000 m² of rental space, 500 m² of which are equipped with 160 racks and PDUs, and 500 m² can be configured on customer request. Construction phase 2: another 4,500 m² server room capacity can be planned...
Deployment time2 weeks Werktage Energy costs per kWh00:16 Euro / kW/h Energy costs included in the price as a flat rateNo
Contact us for a price
In stock
Server room / Rack Two server rooms in separate fire zones. Available in the data center up to 300 m² of rental space. Redundant power supply per rack. Power consumption between 4 kW and 20 kW per rack. Real-time measurement of electricity consumption. Redundant, needs-based...
Deployment time10 to 12 weeks Werktage Energy costs per kWh00:22 Euro / kW/h
Contact us for a price
In stock
Your rack is in a WindCORES in Paderborn, a "state-of-the-art" data center from WestfalenWIND IT, with all the features you would expect from a modern data center. We are proud of our USP's: Green electricity and CO2 neutral! Power consumption up to 30 KW per rack possible! The POE is at our expense! We show the "Total cost of ownership" (TCO); with us there are no hidden costs! WindCORES is regionally available, scalable and geo-redundant on request with direct glass fiber to DE-CIX Frankfurt EN 50600 and VK 3 certified For early bookers: Including a guided tour of the wind turbine!
Energy costs per kWh0.1949 Euro / kW/h
1119,00 € 1019,00  (1182,04  inc tax) You save net: 100,00 €
On backorder
we are the centron
Deployment time2 weeks Werktage Contract period12 months, 24 Months, 36 months, 48 months, 60 months Energy costs per kWh00:25 Euro / kW/h Energy costs included in the price as a flat rateNo
699,00 € 418,60  (485,58  inc tax) You save net: 280,40 €
In stock
Server room / Rack Two server rooms in separate fire zones. Available in the data center up to 300 m² of rental space. Redundant power supply per rack. Power consumption between 4 kW and 20 kW per rack. Real-time measurement of electricity consumption. Redundant, needs-based...
Deployment time10 to 12 weeks Werktage Energy costs per kWh00:22 Euro / kW/h
Contact us for a price
In stock
we are the centron
Deployment time2 weeks Werktage Contract period12 months, 24 Months, 36 months, 48 months, 60 months Energy costs per kWh00:25 Euro / kW/h Energy costs included in the price as a flat rateNo
999,00 € 838,60  (972,78  inc tax) You save net: 160,40 €
In stock
DC10 - Easter renting Server room / Rack Construction phase 1: up to 1,000 m² of rental space, 500 m² of which are equipped with 160 racks and PDUs, and 500 m² can be configured on customer request. Construction phase 2: another 4,500 m² server room capacity can be planned...
Deployment time2 weeks Werktage Energy costs per kWh00:16 Euro / kW/h Energy costs included in the price as a flat rateNo
Contact us for a price
In stock
Your rack is in a WindCORES in Paderborn, a "state-of-the-art" data center from WestfalenWIND IT, with all the features you would expect from a modern data center. We are proud of our USP's: Green electricity and CO2 neutral! Power consumption up to 30 KW per rack possible! The POE is at our expense! We show the "Total cost of ownership" (TCO); with us there are no hidden costs! WindCORES is regionally available, scalable and geo-redundant on request with direct glass fiber to DE-CIX Frankfurt EN 50600 and VK 3 certified For early bookers: Including a guided tour of the wind turbine!
Energy costs per kWh0.1949 Euro / kW/h
1119,00  (1298,04  inc tax)
On backorder
Server room / rack Two server rooms in separate fire zones. Available in the data center up to 300 m² of rental space. Redundant power supply per rack. Power consumption between 4 kW and 20 kW per rack. Real-time measurement of electricity consumption. Redundant, needs-based...
Energy costs per kWh00:22 Euro / kW/h
Contact us for a price
In stock
DC10 - Easter renting Server room / rack Construction phase 1: up to 1,000 m² of rental space, 500 m² of which are equipped with 160 racks and PDUs and 500 m² can be configured on customer request. Construction phase 2: Another 4,500 m² server room capacity can be planned flexibly...
Deployment time2 weeks Werktage Energy costs per kWh00:16 Euro / kW/h Energy costs included in the price as a flat rateNo
Contact us for a price
In stock

Minimum quantity for "DC10 Rack - ready to use" is 1.